Build connections in a structured way
Network areas and data paths are assigned by function.
Suggestions appear from three characters.
No match. Try another term or choose a topic below.
Validate the controller against a model
The topic area at a glance
Customers we work for
Joint projects and their results
Working at IQstruct Engineering
ISO 9001 and TISAX
Alliances, associations, marketplaces
Quality policy and certificate

Connect office, server and machine networks with a coordinated switching and routing structure.
Connections that have grown over time make changes and troubleshooting harder. Especially between production and corporate IT, data paths and responsibilities have to remain recognisable.
IQstruct Engineering plans and integrates networks in the IT and OT environment. Layer 2 and layer 3 structures, VLANs, switching and routing are coordinated with the existing applications. The architecture takes data connection, segmentation and subsequent operation into account.
In a free first conversation we look at your network plan and name which segment comes about first.
Network areas and data paths are assigned by function.
Industrial communication is coordinated with the requirements of office IT.
Network structure and responsibility are linked with operation and security.
IQstruct Engineering plans and integrates networks in the IT and OT environment.
Layer 2 and layer 3 structures, VLANs, switching and routing are coordinated with the existing applications. Classic IT networks and industrial networks close to the machines are connected and segmented in one shared architecture.
New measuring points, servers or applications change communication paths. Network planning is therefore coordinated with the connected systems: switching and routing establish the connection, and segmentation limits it to suit the need. Firewalls, DMZ and allowlisting are planned together with security and operation.


Network
A traceable structure makes operation, troubleshooting and later extensions easier.
Ai1
Record the network inventory
Office IT, production, servers, NAS and transitions are shown in one network diagram.
Ai2
Design the network
Switches, routers, VLANs and patch panels are planned with labelled ports.
Ai3
Install the network
Cabling and devices are installed with labels, and the VLANs are configured.
Ai4
Monitor the network
Traffic, states and security findings are reviewed in monitoring.
Separate network areas for office, servers and production.
Controlled connections between the network areas.
Communication close to the machines is integrated into the overall architecture.
IT/OT
Changes to servers and access often affect several systems at once.
A certified IT security auditor (TÜV) works in the team. Network planning and security are therefore run in the same project. Dependencies, access paths and affected applications are therefore reviewed together before a change. The agreed procedure includes a maintenance window, the functional test and a documented way back. Ongoing support keeps configurations and responsibilities current, so that later extensions stay traceable as well.
We are glad to answer your detailed questions in a personal conversation.
The scope of services and operation, including availability, is defined per order.
Yes. Machine, production and office networks are connected and segmented in one coordinated architecture.
We can take over monitoring, maintenance and support afterwards.
Every industry has its particularities. That calls for a reliable partner who knows the requirements and delivers suitable solutions.
First conversation
Describe your task. We agree a date and discuss the possible project scope.
Ai1
You request an appointment
Ai2
We discuss your requirements
Ai3
You receive a quotation for the agreed scope

Describe your task in the contact form. We come back with a proposed date.
Arrange a first conversationBooking calendar
The booking calendar appears here. It loads only after your consent, because your browser connects to Microsoft in the process.
Discover further suitable services.
Separate production and office areas and define the communication paths required.
Choose and integrate cable or wireless connections to suit the measuring point.
Combine monitoring, updates and support in one agreed operating model.